It was a mixed work scope over the weekend. Installing the large family bath one day (along with new bath taps), master en-suite mirror, electrics in the boiler room and gas line (yes I had some help that day from mum & dad!), putting in insulation in the garage the next and then some carpentry with dwangs, stud walls and plywood areas for mounting sockets and central vacuum units and also on the log store.