Good progress has been made over the last week with all the ground floor interior and exterior SIPs being installed along with the joists.
|
West wing joists in place |
With so many of the seperating wall on the ground floor being SIPs we are really starting to get an idea of the floor layout and the room size. I also manage to measure the structural openings for some of the windows and doors to confirm the windows sizes before they go to manufacture - eveything looks good on that front.
|
Utility & boiler room from the kitchen |
|
Master bedroom |
The scaffolding around the exterior of the house to allow access to erect the first floor and roof was also started to be put in place during the week.
|
Scaffolding on west side of house |
The weather again co operated with us staying sunny and dry all week. If we get everything up before the weather changes it will be a miracle but we certainly can't complain about the way it has treated us so far.