Saturday, 7 April 2012

Ready for screed

After 8 hard days work we are now ready for the screed to be poured on both floors of the house. We have been busy laying floor insulation , DPM and UFH pipe work all week. Its amazing how much time this all takes.  There have been times when I have thought I should have just paid someone to do this but doing it ourselves I know that things have been done correctly and know the systems inside out now - not to mention hopefully saving some costs. All the sweat equity we are investing makes the emotional bond with the house stronger! We ran out of clips for the UFH pipes on Wednesday and Heidi checked with an untold number of companies in the area before finally managing to source some locally on Friday which really saved our bacon. This was about the one material shortage of the works so the up front planning was pretty good - even if I say so myself!

All UFH loops are now terminated and have been pressure tested. Getting to this stage has been critical path activity for us and when the floors are screeded we can really start to progress again. We had a meeting with our joiner during the week as well to discuss the next stage of work for him since this is the next phase of work for us.

Looking from thedining room to the front door - DPM  down
Kitchen with DPM & pipe Cliptrack

UFH pipes installed in the dining and hall area
The big 10 loop UFH manifold before termination....

....and after


We also took delivery of the insulation that goes below the first floor ( keeping the heat from the UFH system in the first floor screed rather than going down to heat the air in the ceiling of the ground floor ) and the garage storage area plus the two baths for the house during the week so have no space left in the garage now. these two deliveries were delayed from our February trip over so it was good to finally get the goods on site.

While the house is basically completed externally the garden still needs attention and Heidi had a meeting with the landscapers during the week to try to progress this aspect. Between them they have some interesting ideas which I am looking forward to seeing sketched up. We are looking at keeping things simple inititally until we are actually back in Scotland but still wondering how much this will cost to acheive.

After concentrating on getting ready for the screed for so long my thoughts can now turn to the work list for my next work weekend in the beginning of May. I look forward to having solid floors again and not having to tip toe around on the insulations and UFH pipes


Monday, 26 March 2012

Water connection made

After what has seemed an age and way more work than should be necessary for what ia a relatively simple operation we have finally got water on site now. This was one of the last pieces we needed in place to allow the screed to be poured. This is scheduled for the 16th April so a busy week for us next week getting the last of the UFH installation done.

The water stop cock cover


One other piece of news that slipped un reported from earlier this month is the installation of a fence around the property. After the building site Heras fencing went the plot was left open so this now encloses it again and forms the start of our landscaping works.

The fence along the road.....

.....by the pump and lane....

.....south east boundary.....

....and the boundary with Mawgan

Thursday, 22 March 2012

Pictures from February 2012

This will be a first.... this is Heidi updating the blog!!  Aha!  I hope I get this right....

Here are some pictures of the house, taken during our last family trip back to Aberdeen in February 2012.  It was a fun photo session as I was finally able to capture the whole house using my new wide angle lens :)


View of the house from the private lane


View from the instersection of the main road and private lane


View from the main road - loving all the glazing!!


Lounge - flooring insulation down, ready for underfloor heating pipes


Master bedroom suite, minus partition walls - ready for screed!


Part of back side of house... kitchen, utility room, and then garage


Looking forward to our next trip back when we'll finish the underfloor heating pipe installation and have both floors ready for screed!  Very exciting!!!!

Wednesday, 14 March 2012

Floor insulation progressing

The first weekend of March I managed to get a weekend of work done on the ground floor insulation and DPM with flights paid by work since I was doing my offshore survival refresher on the Monday.

Mum & I got busy laying the insulation in the utility room wing and DPM in the lounge, study, and utility. The utility room was a royal pain due to all the ducts and pipe work that comes into this area. All these things slow the process up considerably.

DPM down in the lounge...

...study...

..and utility room

After getting that work done we started with the insulation in the hall area, laying away from the front door. Laying full sheets is easy, its all the cutting and fiddling that is slow and tedious. After my course on Monday I spent a few more hours working on the fiddly stuff. The way I looked at it is that its a few hours less that I have to do in future!

Insulation going down in the hall
 At the end of last week we had the track inspection completed for the water connection so I am now just waiting on a call to make an appointment to make the connection to the mains. Need water on site to allow filling and testing of the UFH loops

We are back as a familiy again in 2 weeks time. That will be a big push to get the remaining work for the UFH completed so we can get on and get the screed down.

Friday, 24 February 2012

UFH installation progressing

Things progressing slowly at the moment since we have moved inside with the work scope. This is due to our UFH contractor (us!) not being availble to get back on site on a regaular basis and getting the UFH system installed is on the critical path. We were back for a long week during the kids winter break and managed to get all the UFH loops installed on the first floor and all the materials that were laying around the house moved into the garage - where they are now laying around!

Heidi and I worked hard while mum & dad looked after the boys for a few days - although visually not much seemed to have changed despite al lot of effort. This allowed us to make good progress although all the tidying up and small fiddly jobs always take more time than you think. I also started to don my ventilation and plumbers caps with some hardware being installed under the steps in the storage room ahead of us screeding. Again a fiddly job with lots of pipe and ducts running in a fairly small area

Heidi also had a meeting with a landscaping company about progressing the landscaping works, in particular the fencing around the site since we have nothing there anymore. We also met with the building contractor to discuss outstanding point so that we can get that contract closed out. It was fairly small list since we have kept on top of small snagging items as we have gone along.

I am back for a weekend in just over a weeks time and hope to get cracking with more ground floor insulation, DPM & UFH pipe laying operations planned. We are then back as a familiy again the week of Easter for a big push to get us to screeding readiness

Wednesday, 25 January 2012

External works complete

Well after approx 11 months of hard work we have now reached a big milestone with all external works now being complete. Over the last couple of weeks the sewage tank has gone in and the last of the drainage has been hooked up.

Sewage tank waiting to go in....
 
...and in a big hole

The garage also has its concrete floor now so we can start storing stuff out there and free up the space inside the house to get the floor insulation down

Garage floor poured

The top soil has been spread and hard core placed in the drive so the final levels around the house can now be seen and the whole site now looks a whole lot tidier. With the heras fencing now gone as well we are finally able to see what the house and plot look like together without anything diverting the eye.

The future lawn area




South west corner




Hardcore on drive and footpath area
Seen from the woods


Landscaping and lots of internal works are the order of the day for 2012 - this means lots of work for myself since I am the plumbing and ventilation contractor but I'm looking forward to it. Heidi is looking after the landscaping aspect and will be speaking with various companies when we are back in a couple of weeks time.

Sunday, 15 January 2012

A new year and back to work

After the festive break its back to work again. The ground work folks are back to finish of the last remaining work scope. The week just past has seen the drainage finished off, hard laid around the areas that will be paved, and the garage floor poured.

Filling in outside the lounge

Back fill behind the garage

Hard core outside the kitchen

Stove flue installed

A couple more weeks work should see the ground works finished and then the focus will turn to the landscaping and the internals. Next visit back for us is Februray as a whole family.